{"id":9052,"date":"2013-11-07T12:31:22","date_gmt":"2013-11-07T19:31:22","guid":{"rendered":"http:\/\/www.yellowstonegate.com\/?p=9052"},"modified":"2013-11-07T12:33:03","modified_gmt":"2013-11-07T19:33:03","slug":"repairs-completed-on-yellowstone-road-between-east-entrance-and-fishing-bridge","status":"publish","type":"post","link":"https:\/\/www.yellowstonegate.com\/?p=9052","title":{"rendered":"Repairs completed on Yellowstone road between East Entrance and Fishing Bridge"},"content":{"rendered":"<figure id=\"attachment_9053\" aria-describedby=\"caption-attachment-9053\" style=\"width: 771px\" class=\"wp-caption right\"><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-9053\" alt=\"Ruffin Prevost\/Yellowstone Gate\" src=\"http:\/\/www.yellowstonegate.com\/wp-content\/uploads\/2013\/11\/nine-mile-fixed-771x482.jpg\" width=\"771\" height=\"482\" srcset=\"https:\/\/www.yellowstonegate.com\/wp-content\/uploads\/2013\/11\/nine-mile-fixed-771x482.jpg 771w, https:\/\/www.yellowstonegate.com\/wp-content\/uploads\/2013\/11\/nine-mile-fixed-336x210.jpg 336w, https:\/\/www.yellowstonegate.com\/wp-content\/uploads\/2013\/11\/nine-mile-fixed-768x480.jpg 768w, https:\/\/www.yellowstonegate.com\/wp-content\/uploads\/2013\/11\/nine-mile-fixed-400x250.jpg 400w, https:\/\/www.yellowstonegate.com\/wp-content\/uploads\/2013\/11\/nine-mile-fixed.jpg 900w\" sizes=\"(max-width: 771px) 100vw, 771px\" \/><figcaption id=\"caption-attachment-9053\" class=\"wp-caption-text\">A vehicle travels west along the East Entrance Road in Yellowstone National Park. A $1.3 million reconstruction of the washed-out section of road was completed last month.<\/figcaption><\/figure>\n<p>CODY, WYO. \u2014 Though Yellowstone National Park was closed to visitors during the government shutdown, contractors were able to continue working, allowing them to complete repairs to a damaged portion of the road between the park\u2019s East Entrance and Fishing Bridge.<\/p>\n<p>Part of the eastbound lane along a section of road known as \u201cNine Mile,\u201d near Lake Butte Overlook and Sedge Bay, was washed away in May 2011, just days after the park\u2019s East Entrance had opened for the summer season.<\/p>\n<p>Travel at that spot had since been restricted to a single lane, with an automated traffic light controlling vehicle flows, typically resulting in brief delays of five minutes or less.<\/p>\n<p>The $1.3 million repair job was awarded HK Contractors Inc. from Idaho Falls, Idaho, said Yellowstone spokesman Dan Hottle. Subcontractors included\u00a0 Hayward-Baker and Sletten Construction.<\/p>\n<figure id=\"attachment_1247\" aria-describedby=\"caption-attachment-1247\" style=\"width: 771px\" class=\"wp-caption right\"><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-1247\" alt=\"Traffic in 2012 moves along a single lane of the then-damaged road between Sylvan Pass and Fishing Bridge in Yellowstone National Park. \" src=\"http:\/\/www.yellowstonegate.com\/wp-content\/uploads\/2011\/11\/yellowstone-roadfix-771x505.jpg\" width=\"771\" height=\"505\" srcset=\"https:\/\/www.yellowstonegate.com\/wp-content\/uploads\/2011\/11\/yellowstone-roadfix-771x505.jpg 771w, https:\/\/www.yellowstonegate.com\/wp-content\/uploads\/2011\/11\/yellowstone-roadfix-336x220.jpg 336w, https:\/\/www.yellowstonegate.com\/wp-content\/uploads\/2011\/11\/yellowstone-roadfix-768x503.jpg 768w, https:\/\/www.yellowstonegate.com\/wp-content\/uploads\/2011\/11\/yellowstone-roadfix-1536x1007.jpg 1536w, https:\/\/www.yellowstonegate.com\/wp-content\/uploads\/2011\/11\/yellowstone-roadfix-1200x787.jpg 1200w, https:\/\/www.yellowstonegate.com\/wp-content\/uploads\/2011\/11\/yellowstone-roadfix-1024x671.jpg 1024w, https:\/\/www.yellowstonegate.com\/wp-content\/uploads\/2011\/11\/yellowstone-roadfix-1568x1028.jpg 1568w, https:\/\/www.yellowstonegate.com\/wp-content\/uploads\/2011\/11\/yellowstone-roadfix-400x262.jpg 400w, https:\/\/www.yellowstonegate.com\/wp-content\/uploads\/2011\/11\/yellowstone-roadfix.jpg 2000w\" sizes=\"(max-width: 771px) 100vw, 771px\" \/><figcaption id=\"caption-attachment-1247\" class=\"wp-caption-text\">Traffic in 2012 moves along a single lane of the then-damaged road between Sylvan Pass and Fishing Bridge in Yellowstone National Park. (Yellowstone Gate file photo)<\/figcaption><\/figure>\n<p>Hottle said the job was finished Oct. 11, six days ahead of schedule, and that work came in slightly under budget thanks to savings realized from value engineering.<\/p>\n<p>Some business owners in the gateway community of Cody, Wyo. had expressed frustration over the wait of nearly 2 1\/2 years for repairs to be completed, but most said the temporary single-lane solution had not diminished tourist traffic along the East Entrance Road.<\/p>\n<p>Park officials have said that repairs were complex and that securing funding took considerable time. An initial round of bids came in over budget, further delaying the fix.<\/p>\n<p>Scott Balyo, executive director of the Cody Country Chamber of Commerce, said disruptions during the repair work were minimal.<\/p>\n<p>\u201cIt probably did take longer than anyone would have liked, but we never faced a road closure from it,\u201d Balyo said. \u201cHaving a minute or two delay at the light was a minor inconvenience, and it appears they\u2019ve done a great job on it.\u201d<\/p>\n<p>The road failed when saturated sub-surface soils slid along a section of bedrock angled toward Yellowstone Lake, Hottle said.<\/p>\n<p>Water from spring precipitation and melting snow traveled between the bedrock and granular soils closer to the surface, hastening the road failure, he said.<\/p>\n<p>Repairs required removing the unstable soil down to the bedrock and creating a flat bench to provide a firm base for the new road.<\/p>\n<p>\u201cA mechanically-stabilized earth wall system was constructed from the flat bench, up to the existing roadway elevation, approximately 45 feet at maximum depth,\u201d Hottle said.<\/p>\n<p>Contractors installed a new drainage system beneath the road to direct water away from the road surface and to the lake below.<\/p>\n<p>The Federal Highway Administration installed a monitoring well and made other borings around the road in 2008 as part of a geotechnical investigation into previously existing problems with the road, Hottle said.<\/p>\n<p>Data gathered from that process helped guide designs for the reconstructed road.<\/p>\n<p><i>Contact Ruffin Prevost at 307-213-9818 or <\/i><a href=\"mailto:ruffin@yellowstonegate.com\"><i>ruffin@yellowstonegate.com<\/i><\/a><i>.<\/i><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Though Yellowstone National Park was closed to visitors during the government shutdown, contractors were able to continue working, allowing them to complete repairs to a damaged portion of the road between the park\u2019s East Entrance and Fishing Bridge. The $1.3 million repair job was completed six days ahead of schedule and slightly under budget. The road failed in May 2011 after heavy spring precipitation and rapidly melting snow.<\/p>\n","protected":false},"author":6,"featured_media":9053,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"newspack_ads_suppress_ads":false,"newspack_popups_has_disabled_popups":false,"_jetpack_memberships_contains_paid_content":false,"newspack_featured_image_position":"","newspack_post_subtitle":"","newspack_article_summary_title":"Overview:","newspack_article_summary":"","newspack_hide_updated_date":false,"newspack_show_updated_date":false,"footnotes":""},"categories":[8,312],"tags":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v23.0 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Repairs completed on Yellowstone road between East Entrance and Fishing Bridge - Yellowstone Gate<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.yellowstonegate.com\/?p=9052\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Repairs completed on Yellowstone road between East Entrance and Fishing Bridge - Yellowstone Gate\" \/>\n<meta property=\"og:description\" content=\"Though Yellowstone National Park was closed to visitors during the government shutdown, contractors were able to continue working, allowing them to complete repairs to a damaged portion of the road between the park\u2019s East Entrance and Fishing Bridge. The $1.3 million repair job was completed six days ahead of schedule and slightly under budget. The road failed in May 2011 after heavy spring precipitation and rapidly melting snow.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.yellowstonegate.com\/?p=9052\" \/>\n<meta property=\"og:site_name\" content=\"Yellowstone Gate\" \/>\n<meta property=\"article:published_time\" content=\"2013-11-07T19:31:22+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2013-11-07T19:33:03+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.yellowstonegate.com\/wp-content\/uploads\/2013\/11\/nine-mile-fixed.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"900\" \/>\n\t<meta property=\"og:image:height\" content=\"563\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Ruffin Prevost\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@https:\/\/twitter.com\/ruffinprevost\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Ruffin Prevost\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.yellowstonegate.com\/?p=9052#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.yellowstonegate.com\/?p=9052\"},\"author\":{\"name\":\"Ruffin Prevost\",\"@id\":\"https:\/\/www.yellowstonegate.com\/#\/schema\/person\/1a1f8e053cac2fd776df966853da767b\"},\"headline\":\"Repairs completed on Yellowstone road between East Entrance and Fishing Bridge\",\"datePublished\":\"2013-11-07T19:31:22+00:00\",\"dateModified\":\"2013-11-07T19:33:03+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.yellowstonegate.com\/?p=9052\"},\"wordCount\":545,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.yellowstonegate.com\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.yellowstonegate.com\/?p=9052#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.yellowstonegate.com\/wp-content\/uploads\/2013\/11\/nine-mile-fixed.jpg\",\"articleSection\":[\"Gateway Towns\",\"Yellowstone\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.yellowstonegate.com\/?p=9052#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.yellowstonegate.com\/?p=9052\",\"url\":\"https:\/\/www.yellowstonegate.com\/?p=9052\",\"name\":\"Repairs completed on Yellowstone road between East Entrance and Fishing Bridge - Yellowstone Gate\",\"isPartOf\":{\"@id\":\"https:\/\/www.yellowstonegate.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.yellowstonegate.com\/?p=9052#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.yellowstonegate.com\/?p=9052#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.yellowstonegate.com\/wp-content\/uploads\/2013\/11\/nine-mile-fixed.jpg\",\"datePublished\":\"2013-11-07T19:31:22+00:00\",\"dateModified\":\"2013-11-07T19:33:03+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.yellowstonegate.com\/?p=9052#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.yellowstonegate.com\/?p=9052\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.yellowstonegate.com\/?p=9052#primaryimage\",\"url\":\"https:\/\/www.yellowstonegate.com\/wp-content\/uploads\/2013\/11\/nine-mile-fixed.jpg\",\"contentUrl\":\"https:\/\/www.yellowstonegate.com\/wp-content\/uploads\/2013\/11\/nine-mile-fixed.jpg\",\"width\":900,\"height\":563,\"caption\":\"A vehicle travels west along the East Entrance Road in Yellowstone National Park. A $1.3 million reconstruction of the washed-out section of road was completed last month.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.yellowstonegate.com\/?p=9052#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.yellowstonegate.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Repairs completed on Yellowstone road between East Entrance and Fishing Bridge\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.yellowstonegate.com\/#website\",\"url\":\"https:\/\/www.yellowstonegate.com\/\",\"name\":\"Yellowstone Gate\",\"description\":\"Yellowstone and Grand Teton community news &amp; inside views\",\"publisher\":{\"@id\":\"https:\/\/www.yellowstonegate.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.yellowstonegate.com\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.yellowstonegate.com\/#organization\",\"name\":\"Yellowstone Gate\",\"url\":\"https:\/\/www.yellowstonegate.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.yellowstonegate.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.yellowstonegate.com\/wp-content\/uploads\/2024\/05\/yellowstone-gate-logo-horiz.png\",\"contentUrl\":\"https:\/\/www.yellowstonegate.com\/wp-content\/uploads\/2024\/05\/yellowstone-gate-logo-horiz.png\",\"width\":764,\"height\":152,\"caption\":\"Yellowstone Gate\"},\"image\":{\"@id\":\"https:\/\/www.yellowstonegate.com\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.yellowstonegate.com\/#\/schema\/person\/1a1f8e053cac2fd776df966853da767b\",\"name\":\"Ruffin Prevost\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.yellowstonegate.com\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/5d0e481cc4687c8e4bfe58eda8e58f83?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/5d0e481cc4687c8e4bfe58eda8e58f83?s=96&d=mm&r=g\",\"caption\":\"Ruffin Prevost\"},\"description\":\"Ruffin Prevost is founding editor of Yellowstone Gate, an independent, online news service about Yellowstone and Grand Teton parks and their gateway communities. He lives in Cody, Wyo., where he also works as the Wyoming reporter for Reuters news service. He worked from 2005-10 as the Wyoming reporter for the Billings Gazette and has also been managing editor of WyoFile.\",\"sameAs\":[\"http:\/\/yellowstonegate.com\",\"http:\/\/www.linkedin.com\/pub\/ruffin-prevost\/33\/a33\/7b\",\"https:\/\/x.com\/https:\/\/twitter.com\/ruffinprevost\"],\"url\":\"https:\/\/www.yellowstonegate.com\/?author=6\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Repairs completed on Yellowstone road between East Entrance and Fishing Bridge - Yellowstone Gate","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.yellowstonegate.com\/?p=9052","og_locale":"en_US","og_type":"article","og_title":"Repairs completed on Yellowstone road between East Entrance and Fishing Bridge - Yellowstone Gate","og_description":"Though Yellowstone National Park was closed to visitors during the government shutdown, contractors were able to continue working, allowing them to complete repairs to a damaged portion of the road between the park\u2019s East Entrance and Fishing Bridge. The $1.3 million repair job was completed six days ahead of schedule and slightly under budget. The road failed in May 2011 after heavy spring precipitation and rapidly melting snow.","og_url":"https:\/\/www.yellowstonegate.com\/?p=9052","og_site_name":"Yellowstone Gate","article_published_time":"2013-11-07T19:31:22+00:00","article_modified_time":"2013-11-07T19:33:03+00:00","og_image":[{"width":900,"height":563,"url":"https:\/\/www.yellowstonegate.com\/wp-content\/uploads\/2013\/11\/nine-mile-fixed.jpg","type":"image\/jpeg"}],"author":"Ruffin Prevost","twitter_card":"summary_large_image","twitter_creator":"@https:\/\/twitter.com\/ruffinprevost","twitter_misc":{"Written by":"Ruffin Prevost","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.yellowstonegate.com\/?p=9052#article","isPartOf":{"@id":"https:\/\/www.yellowstonegate.com\/?p=9052"},"author":{"name":"Ruffin Prevost","@id":"https:\/\/www.yellowstonegate.com\/#\/schema\/person\/1a1f8e053cac2fd776df966853da767b"},"headline":"Repairs completed on Yellowstone road between East Entrance and Fishing Bridge","datePublished":"2013-11-07T19:31:22+00:00","dateModified":"2013-11-07T19:33:03+00:00","mainEntityOfPage":{"@id":"https:\/\/www.yellowstonegate.com\/?p=9052"},"wordCount":545,"commentCount":0,"publisher":{"@id":"https:\/\/www.yellowstonegate.com\/#organization"},"image":{"@id":"https:\/\/www.yellowstonegate.com\/?p=9052#primaryimage"},"thumbnailUrl":"https:\/\/www.yellowstonegate.com\/wp-content\/uploads\/2013\/11\/nine-mile-fixed.jpg","articleSection":["Gateway Towns","Yellowstone"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.yellowstonegate.com\/?p=9052#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.yellowstonegate.com\/?p=9052","url":"https:\/\/www.yellowstonegate.com\/?p=9052","name":"Repairs completed on Yellowstone road between East Entrance and Fishing Bridge - Yellowstone Gate","isPartOf":{"@id":"https:\/\/www.yellowstonegate.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.yellowstonegate.com\/?p=9052#primaryimage"},"image":{"@id":"https:\/\/www.yellowstonegate.com\/?p=9052#primaryimage"},"thumbnailUrl":"https:\/\/www.yellowstonegate.com\/wp-content\/uploads\/2013\/11\/nine-mile-fixed.jpg","datePublished":"2013-11-07T19:31:22+00:00","dateModified":"2013-11-07T19:33:03+00:00","breadcrumb":{"@id":"https:\/\/www.yellowstonegate.com\/?p=9052#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.yellowstonegate.com\/?p=9052"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.yellowstonegate.com\/?p=9052#primaryimage","url":"https:\/\/www.yellowstonegate.com\/wp-content\/uploads\/2013\/11\/nine-mile-fixed.jpg","contentUrl":"https:\/\/www.yellowstonegate.com\/wp-content\/uploads\/2013\/11\/nine-mile-fixed.jpg","width":900,"height":563,"caption":"A vehicle travels west along the East Entrance Road in Yellowstone National Park. A $1.3 million reconstruction of the washed-out section of road was completed last month."},{"@type":"BreadcrumbList","@id":"https:\/\/www.yellowstonegate.com\/?p=9052#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.yellowstonegate.com\/"},{"@type":"ListItem","position":2,"name":"Repairs completed on Yellowstone road between East Entrance and Fishing Bridge"}]},{"@type":"WebSite","@id":"https:\/\/www.yellowstonegate.com\/#website","url":"https:\/\/www.yellowstonegate.com\/","name":"Yellowstone Gate","description":"Yellowstone and Grand Teton community news &amp; inside views","publisher":{"@id":"https:\/\/www.yellowstonegate.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.yellowstonegate.com\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.yellowstonegate.com\/#organization","name":"Yellowstone Gate","url":"https:\/\/www.yellowstonegate.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.yellowstonegate.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.yellowstonegate.com\/wp-content\/uploads\/2024\/05\/yellowstone-gate-logo-horiz.png","contentUrl":"https:\/\/www.yellowstonegate.com\/wp-content\/uploads\/2024\/05\/yellowstone-gate-logo-horiz.png","width":764,"height":152,"caption":"Yellowstone Gate"},"image":{"@id":"https:\/\/www.yellowstonegate.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.yellowstonegate.com\/#\/schema\/person\/1a1f8e053cac2fd776df966853da767b","name":"Ruffin Prevost","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.yellowstonegate.com\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/5d0e481cc4687c8e4bfe58eda8e58f83?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/5d0e481cc4687c8e4bfe58eda8e58f83?s=96&d=mm&r=g","caption":"Ruffin Prevost"},"description":"Ruffin Prevost is founding editor of Yellowstone Gate, an independent, online news service about Yellowstone and Grand Teton parks and their gateway communities. He lives in Cody, Wyo., where he also works as the Wyoming reporter for Reuters news service. He worked from 2005-10 as the Wyoming reporter for the Billings Gazette and has also been managing editor of WyoFile.","sameAs":["http:\/\/yellowstonegate.com","http:\/\/www.linkedin.com\/pub\/ruffin-prevost\/33\/a33\/7b","https:\/\/x.com\/https:\/\/twitter.com\/ruffinprevost"],"url":"https:\/\/www.yellowstonegate.com\/?author=6"}]}},"jetpack_sharing_enabled":true,"jetpack_featured_media_url":"https:\/\/www.yellowstonegate.com\/wp-content\/uploads\/2013\/11\/nine-mile-fixed.jpg","_links":{"self":[{"href":"https:\/\/www.yellowstonegate.com\/index.php?rest_route=\/wp\/v2\/posts\/9052"}],"collection":[{"href":"https:\/\/www.yellowstonegate.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.yellowstonegate.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.yellowstonegate.com\/index.php?rest_route=\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/www.yellowstonegate.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=9052"}],"version-history":[{"count":3,"href":"https:\/\/www.yellowstonegate.com\/index.php?rest_route=\/wp\/v2\/posts\/9052\/revisions"}],"predecessor-version":[{"id":9055,"href":"https:\/\/www.yellowstonegate.com\/index.php?rest_route=\/wp\/v2\/posts\/9052\/revisions\/9055"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.yellowstonegate.com\/index.php?rest_route=\/wp\/v2\/media\/9053"}],"wp:attachment":[{"href":"https:\/\/www.yellowstonegate.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=9052"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.yellowstonegate.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=9052"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.yellowstonegate.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=9052"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}